What is the NOI

The Notice of Intent (NOI) informs the EPD that the project exists and will soon begin. The NOI also provides basic information about the site, including: Owner/operator

  • Location
  • Land disturbance activity permit no.
  • Receiving waters
  • Certification that an Erosion, Sedimentation, and Pollution Control Plan has been prepared

The NOI must be submitted at least one week before construction begins.

If more than 50 acres are to be disturbed, the ESPCP and CMP must be submitted to EPD with the NOI

Copyright 2008 © All rights reserved.
Privacy Policy
2601 Northlake Drive
Suwanee GA 30024
Telephone: (678) 380-6007
Fax: (678) 380-0371
E-mail: info@npdesreport.com