The construction site must be inspected weekly for BMP compliance. The weekily inspections shall include the following:
(a) disturbed areas of the primary permittee’s construction site that have not undergone final
stabilization;
(b) areas used by the primary permittee for storage of materials that are exposed to precipitation that have not undergone final stabilization;
structural control measures. Erosion and sediment control measures identified in the Plan applicable to the primary permittee’s site shall be observed to ensure that they are operating correctly. Where discharge locations or points are accessible, they shall be inspected to ascertain whether erosion control measures are effective in preventing significant impacts to receiving water(s).