Failure to properly design, install, or maintain BMPs constitutes a violation of the permit.
If BMPs are insufficient, additional violations may occur depending on the turbidity of storm water samples.
|
Our Weekly inspection package inludes the following services:
- Weekly Inspections
- Post-Rainfall Inspections
- Collection of daily rainfall
- Weekly Photographic Documentation
- Monthly Submittal to the appropriate EPD branch by return receipt (if required)
- All site documentation kept onsite in a onsite job box and plan holder
- Inspections sent by email
- Site photoographs documenting effective and ineffective BMP's
- Secure online database of all site documentation accessible by internet 24/7
Links to additional Services:
|